Testing, Balancing & Commissioning

Airflow, velocity, pressure and noise testing to prove the installed system performs to design.

Overview

Installation isn't finished until it's measured. We test and balance every system before handover — airflow velocity, pressurization, HEPA integrity, particle counts, and light and noise levels — with documented results.

What's included

  • Air velocity & airflow volume testing
  • Pressurization & filter integrity testing
  • Particle counting for cleanroom areas
  • Light and noise level assessments